Schedule of Requirements

A Schedule of Requirements (SoR) is a document in which the starting points of the requiring party(s) are established The SoR can be divided into:

- SoR for SHEVS systems
- SoR for Fire detection systems
- SoR for Overpressure systems

The SoR should accomplish the following:
- projection of the structural provisions in accordance with the starting points of the SoR
- installation of the described system as indicated in the SoR by the installation company.
- construction of transmission routes (retaining function) in accordance with the regulation

After the installation work, the SoR functions as a document for the benefit of inspection and certification of the system.

Exiss provides an independent SoR in which a critical look is taken at the other system components within a complex. One could think of controlling the lifts, doors, air-treatment boxes, etc.
The National Centre for Prevention (NCP) is always entitled to have a final inspection and/or yearly inspection performed by an independent, accredited inspection bureau.